OUR NEWEST GROUNDBREAKING TYPE OF POOL CONSTRUCTION THAT BRINGS AN UPGRADED BEACH LOOK AND FEEL TO YOUR BACKYARD
Step 1:
Unlike typical pool installations, the excavation process involves detailed contouring to create the pool’s shape and internal features. In addition, the sides of the pool are gently sloped at 10- to 50-degree angles.
Step 2:
An initial layer of geo-textile material is placed over the excavation to protect the EDPM liner from potential damage caused by sharp objects.
Step 3:
An EPDM (ethylene propylene diene monomer) waterproof liner is placed over the geo-textile sheet. Highly elastic, the EPDM liner conforms to
any change in ground movement without damage. The liners are made by Firestone using a heavy duty material typically used in retention ponds. The material can be stretched up to 300 percent.
Step 4:
Structural netting material is placed
over the EPDM liner.
Step 5:
A rough structural paving layer is
spread over the entire area by hand
using a mixture of natural granulated
quartz and non-toxic resin.
Step 6:
A second structural net is placed over the structural paving rough layer.
Step 7:
Granulated stone and non-toxic resins are blended and spread over the surface by hand. A final layer of resin is applied after a light sanding.
The Pool Doctor had an opportunity to be featured in a Biodesign commercial segment that we would love for you to view.
Check out our link to the segment below and enjoy!
https://drive.google.com/file/d/1zVKuMn59nncpcqEe25fmuqBv4GeS1QBj/view?pli=1
The Pool Doctor
Copyright © 2024 The Pool Doctor - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.